The Bay City Navigator - Your insight into the City of Bay City
summer holiday office hours sanitation collection

City Offices Closed - May 28, 2018

Memorial Day

Sanitation Crews working Tuesday thru Saturday


City Offices Closed - July 4, 2018
Independence Day

Sanitation Crews working Thursday thru Saturday


Note: City Offices Open & Sanitation Crews working July 2 and July 3
House with Tall Grass

Tall Grass & Weeds Management


A kind reminder:

Section 110-27 states β€œIt shall be the duty of each owner, possessor or occupier of land, and of every person having charge of any land within the City, to cut or remove and destroy all noxious weeds. Noxious weeds shall be defined as all grasses, annual plants, and vegetation other than trees or shrubs; provided, however, this term shall not include cultivated flowers and gardens. All noxious weeds shall be cut or removed and destroyed on or before May 1 of each year. Thereafter, all noxious weeds shall be cut or removed and destroyed before they reach a height of six (6”) inches on lands adjacent to a residence or a height of eight inches on vacant lands or commercial property and, in any case, as necessary to prevent all noxious weeds from going to seed or otherwise spreading or becoming a detriment to the public health.”

The grass program runs from May 1 through October 31. Failure to comply will result in the City undertaking the cutting and/or clean up, and presenting the property owner with a bill for services. 

If you have any questions, please do not hesitate to contact Code Enforcement at (989) 894-8176 or by email to scoggin@baycitymi.org.


ReDirect Your Stuff



Our new online and mobile recycling directory will help redirect your stuff so that it can be properly composted, donated, disposed or recycled. 



BayCityRecycles
Begin Work Zone

2018 Infrastructure Projects

  • Watermain replacement along JFK Drive, near the Bay County Community Center is scheduled for the spring of 2018.
  • First Street, between Washington and Madison, will be reconstructed in the summer of 2018 due to underground utility and street conditions.
  • Johnson Street, between Water and Woodside, will be reconstructed in the summer/fall of 2018 due to underground utility conditions.
  • Wenona Avenue, between North Union and Hart, will be cold milled and resurfaced along with watermain reconstruction in the summer of 2018 in cooperation with Bangor Township.
  • Currently under design is the reconstruction of Trumbull Street between Center and Woodside. Construction is scheduled to begin in the spring of 2019, with utility relocations in 2018.
  • A design survey and geotechnical (soils) study is being conducted on Clara and Dean streets to determine the cause of the settlement in the area and to prepare for road reconstruction tentatively scheduled for 2020.

You can find construction updates at the following link:
https://www.baycitymi.org/596/Construction-Projects 

Nate Doan Park Shelter
Nate Doan Park Shelter 

Park Shelter (Pavilion) Rental


The Bay City Parks Division takes reservations for private use of park shelters. Each shelter is furnished with picnic tables, trash barrels and a picnic grill.

Extra tables and barrels are provided at an additional cost, and are delivered in advance of the rental date.

All shelter reservations are prepared in the Parks Business Office at City Hall, 301 Washington Ave., Suite 413. The office is open from 7:00am-3:30pm Monday thru Friday. The office phone number is 989-894-8314.

For a list of facilities follow this link: https://www.baycitymi.org/Facilities/  

Powered by CivicSend - A product of CivicPlus